Your Complete Guide to Planning Permission

 

Planning permission is a crucial consideration for anyone undertaking property development, home extensions, or even certain changes to existing buildings. Whether you’re dreaming of a kitchen extension, building a garden office, or converting a loft, understanding the ins and outs of planning permission can save you time, money, and unnecessary stress. This comprehensive guide will walk you through what planning permission is, when it’s required, how the process works, common pitfalls, and expert tips for success. If you’re thinking about starting a building project, read on to ensure your plans stay on the right side of the law.

What is Planning Permission?

Planning permission is an official consent granted by your local authority, allowing you to carry out specific construction or alteration works to land or property. Its main purpose is to regulate the development and use of land in the public interest. The overall goal is to ensure new building works or changes to existing structures are appropriate, visually acceptable, and will not negatively impact the community or the environment.

Some changes may be considered “permitted development,” meaning they can go ahead without formal approval (subject to certain limits and conditions). However, more substantial works, or those affecting listed buildings or conservation areas, almost always require full planning permission.

Why is Planning Permission Important?

Failing to secure proper planning permission can have severe consequences. Unauthorized development can lead to enforcement actions, significant fines, and even orders to demolish or revert works. Additionally, when it comes time to sell your property, missing planning consent can delay or derail the process altogether.

Beyond legal compliance, planning permission ensures projects are sympathetic to their surroundings, respect neighbours’ rights to light and privacy, and adhere to environmental and safety standards. Obtaining planning consent is both a legal obligation and a benefit to the whole community.

When Do You Need Planning Permission?

Whether you need planning permission depends on the type, size, and location of your proposed work. Here are the most common triggers for needing planning consent:

  • New Buildings: Constructing a new building, including houses, office blocks, and outbuildings, almost always requires permission.
  • Extensions: Extending your home or any existing structure, especially when extending beyond permitted development rights.
  • Change of Use: Changing how a building or land is used (e.g., converting a shop to a flat) typically needs consent.
  • Major Renovations: Works that significantly alter the appearance or footprint of a building, like adding large windows, balconies, or roof terraces.
  • Listed Buildings and Conservation Areas: Any work in these areas is tightly controlled and usually requires special consent.
  • Other Works: Certain fencing, walls, gates, driveways, and works affecting boundaries with public highways can require permissions.

Permitted development rights can cover minor home alterations, small extensions, garden sheds, or internal changes, but always check with your local planning authority as rules do vary.

The Planning Permission Process

Applying for planning permission may seem daunting, but breaking it down into key steps can help you approach it with confidence:

1. Preliminary Research

Begin by researching your local planning authority’s website for specific guidance and policies. Understand the local plan, conservation considerations, and any neighbourhood planning documents. You may also want to review similar applications in your area to gauge the likelihood of approval.

2. Pre-Application Consultation

Some councils offer pre-application advice. This isn’t a guarantee of approval but can identify problems early on and help tailor your submission to meet local requirements.

3. Preparing Your Application

Most councils now accept online applications via the Planning Portal. Your application will typically include:

  • Completed application form
  • Site location plan and block plan
  • Detailed drawings of existing and proposed work
  • Supporting documents (design and access statement, heritage statement, flood risk assessment, etc.)
  • Payment of processing fee
4. Submission and Validation

After submitting, the planning authority will check if your application is complete (“validated”). If anything is missing, they’ll ask for more information.

5. Neighbour Consultation and Publicity

Once validated, neighbours, relevant organisations, and, where necessary, the general public will be notified and invited to comment—usually over a 21-day period.

6. Assessment by Planning Officers

A planning officer assesses your proposal against local and national policy, considering feedback from the consultation phase. Visits to the site may take place.

7. Decision

Applications are usually decided within 8 to 13 weeks, depending on complexity. The outcome will be approval (possibly with conditions) or refusal, with reasons explained.

8. Appealing a Refusal

If your application is refused, you have the right to appeal. You can revise your plans and resubmit, or appeal to the Planning Inspectorate.

Key Considerations for Your Planning Application

Success in obtaining planning permission depends on several factors. Consider the following to improve your chances:

  • Design: Proposals should be visually attractive, in keeping with the area, and of a suitable scale and style.
  • Impact on Neighbours: Avoid potential complaints by respecting privacy, daylight, views, and boundaries.
  • Environment: Address issues such as flooding, ecology, and energy efficiency.
  • Conservation and Heritage: If your site is listed or in a protected area, you must demonstrate respect for historic character.
  • Access and Parking: Safe vehicular access and adequate parking are often prerequisites.
  • Planning Policy: Applications that comply with your council’s local development plan are more likely to be approved.
Costs Involved in Planning Permission

The cost of obtaining planning permission varies depending on project scale, location, and application type. Typical costs include:

  • Application Fee: Fees vary (in England, currently £258 for a householder application), but always check your local authority’s rates.
  • Drawings and Documentation: Professional architectural plans and surveys (£500-£2,000+).
  • Consultant Fees: Planning consultants can assist with complex applications (fees vary widely).
  • Additional Surveys: For ecological, arboricultural, heritage, flood risk, etc. (may add several hundred or thousands to the total).
  • Resubmission/Appeal Fees: Refused applications may incur further costs if resubmitted or appealed.

Factoring these costs into your project budget is crucial from the outset.

Common Reasons for Refused Planning Permission

Even well-intentioned projects can be refused. The most common reasons include:

  • Poor design, scale, or appearance out of keeping with the local area
  • Negative effect on neighbours (loss of light, privacy, views, or overbearing structures)
  • Harm to the appearance or character of a conservation area
  • Inadequate parking or dangerous